Utility Infrastructure Improvement Projects

The City's Utility Infrastructure includes potable water, reuse water, stormwater, sewer.  Our water treatment plan provides 7.1 million gallons of treated drinking water daily.  The City's utility infrastructure system includes 81 miles of water transmission and distribution lines, 72 miles of gravity sewer and force mains, 42 miles of stormwater, and 16 lift stations. 

The City of Hallandale Beach has an aged and stressed utility infrastructure. Over the years multiple studies have assessed and recommended immediate rehabilitative measures be initiated to mitigate against catastrophic infrastructure failures. Additionally, increased development within the city has necessitated capacity improvements be made to meet the incoming service demands. 

The 2022 Infrastructure Construction Plan was presented to the City Commission on April 6, 2022.  It was prepared to be an outline of the construction schedule for the city's infrastructure rehabilitation. These projects are prioritized based on the recommendations assessed as urgent with in the 2016 Basis of Design Report, 2016 Wastewater Masterplan, 2019 Year Water Supply Plan and the 2014 Water, Wastewater and Stormwater Facilities Plan.  These projects have been reviewed and prioritized on the recommendations of the Engineering Team of the Public Works Department based on need.

This process will be challenging and test the fortitude of our city. The result of this effort will establish a secure, and stable utility for decades to come.

View the full presentation here: Infrastructure Construction Plan

View the News Release here: 2022-0830 NEWS RELEASE HB Infrastructure

Completed Projects

Foster Road Water Main Replacement

Southwest Drainage Project

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Lift Station 8 Replacement

High Service Pump Replacement

Current Projects

Atlantic Shores Roadway Improvement
​Atlantic Shores Public Meeting Presentation 01/30/20
Atlantic Shores Blvd COAT Meeting 2 03/04/20
Project Progress 10/31/20

Atlantic Shores Watermain Replacement (NE 14th Ave) Project in Design

Community Development Block Grant 49 Project in Design

Community Development Block Grant 48 Design Completed

Community Development Block Grant 47 Design Completed, bid in process

FDOT Beautification Project
Project Progress Notification 10/31/20

Force Main Replacement (30") in Design

Force Main Replacement NE 7th Ave in Design
Lift Station 1 Replacement Project - Design Pending

Lift Station 2 Rehabilitation Project Design Complete, bid in process
Lift Station 3 Rehabilitation Project in Design
Lift Station 4 Rehabilitation Project in Design
Lift Station 5 Rehabilitation Project in Design
Lift Station 6 Rehabilitation Project in Design
Lift Station 9 Rehabilitation Project in Design
Lift Station 10 Rehabilitation Project in Design
Lift Station 11 Rehabilitation Project in Design
Lift Station 12 Rehabilitation Project in Design
Lift Station 13 Rehabilitation Project in Design
Lift Station 14 Rehabilitation Project under construction
Lift Station 15 Rehabilitation Project in Design
Lift Station 16 Rehabilitation Project in Design

North Miami Beach Booster Rehabilitation Project in Design
Schaffer Canal Rehabilitation Project Design Complete, bid in process
Three Islands Reuse Irrigation Project
Project Start Notification  01/11/17

Transfer Pump Replacement
​Project Start Notification 04/08/21
Water Main Design NE 7th & NE 18th Ave in Design

Water Main Replacement Layne Blvd in Design

Water Main Replacement Three Islands - Design Pending
Utilities Division